cruise-ships

Cardiff Wales Airport List of works:

  • We first carried out work at Cardiff Wales Airport in 2001.
  • Originally we were called to service and repair many of the existing aluminium windows and doors.
  • Since then we have replaced many of the windows and doors at the airport.
  • Replaced the majority of the doors leading on to the runway.
  • Replaced several large sections of windows in the administration buildings.
  • Replaced many doors around the airport.
  • Replaced windows to the control tower.
  • Replaced windows to the new Scrum Half Bar.
  • Replaced many damaged or smashed panes of glass.
  • Carried out repairs to many other original windows and doors
  • Windows replaced in 2005 to the new “SCRUM HALF BAR”
  • Windows replace using specialist “ANTI BANDIT GLASS” glass as per specifications.
  • Part of a major refit by “Cardiff Wales Airport”
  • We have been installing windows here since 2002.
  • We also carry out servicing and repairs installed by others to other windows and doors at the airport.
Internal view of new “SCRUM HALF BAR”.
Doors to left replaced by us in 2002 after old doors were no longer serviceable.
Doors to right repaired by us on different occasions
Internal view of previous doors
Doors replaced by us on to runway.
Doors used every day for thousands of customers
Doors replaced by us in 2002
Doors replaced by us in 2002
Doors replaced by us in 2002
Doors to administration replaced by us in 2003.
We also replaced over Eighty Linear metres of windows to offices here on three different elevations.
Scaffold erected and Arris fencing all around during installation to protect employees.
Another set of doors and panels to doors leading on to runways
When the new arrival was built the taxi office was moved. And we changed the doors to the above building.
Scaffolding outside new Scrum Half Bar before and after window Installation
Scaffolding outside new Scrum Half Bar before and after window Installation
Scaffolding erected and this installation was completed through EMCOR Facility management services.
Welsh windows have been working with Emcor for three years.
Doors Changed to Caso Paco Restaurant in Barry 2004
Glass changed to police station in swansea.
Classed as unbreakable from any hand wielded instrument.
School door.
Fitted at Cadoxton School, 2008.
School door.
Fitted at High Street School, 2008.
School door.
Fitted in 2008.
New aluminium door.
Installed at High Street School in 2008.